Keeping Up with Silicon ValleyKeeping Up
  1. Today
  2. Edition of Saturday, October 24, 2026
  3. News
NewsReported

Andy Jassy says AWS capacity for 2027 is "largely sold out" and a "good chunk" of 2028 capacity is also sold

From Techmeme: Andy Jassy says AWS capacity for 2027 is “largely sold out” and a “good chunk” of 2028 capacity is also sold, though AWS reserves some capacity for on-demand — Amazon Web Services capacity is mostly booked up through at least next year, Amazon CEO Andy Jassy …

Source
Techmeme (techmeme.com)
Published
First seen here
Edition
Saturday, October 24, 2026, ranked 19
Status
A publication reported this; the company may not have confirmed it.
Why it’s here
AWS capacity sold out for 2027 is a cost and access signal for every AI startup.
Topics
Infrastructure, AI
Analysis

Inside Inner Mongolia, China's fastest-growing AI data center region, where construction is accelerating with low building cost and no public backlash (opens newsletter.semianalysis.com)

Inside Inner Mongolia, China's fastest-growing AI data center region, where construction is accelerating with low building cost and no public backlash — A wind-powered 800MW campus, 120MW built within a year, a 5MW SST-native 800V DC pilot and a cooling design without central chillers

newsletter.semianalysis.comNov 8, 2026Details