How Bangladesh exporters answer buyer RFQs in a day, not three.
Where the two to three days go between a buyer's RFQ and the cost sheet, and how a garment factory can return a sourced sheet within 24 hours without changing how its departments work.
A buyer sends a tech pack and asks for a price. In the garment factories we have sat with, the merchandiser's own work on that RFQ is a little over an hour. The sheet still goes out two or three days later. This is about where those days go, and what it takes to answer the same day.
Where the days go
One merchandiser at a Bangladesh denim and woven group described his quotation-season day to us in September 2026: 100 to 120 emails in, 4 to 6 RFQs, about 30 minutes to read an enquiry and ask the buyer for what is missing, about 45 minutes to build the costing sheet. Then two to three days waiting for internal cost inputs before the quote can go out.
The wait is not idleness. A garment price is six documents made by five departments, in sequence:
- 01The buyer's artwork or sample and the measurement chart, sometimes a CAD file.
- 02Industrial engineering returns the SMV, the CM or factory cost, and the efficiency it assumed.
- 03The CAD room returns fabric and accessory consumption from the marker.
- 04Sourcing collects supplier quotes for the trims: buttons, rivets, zippers, labels.
- 05Washing prices the wash.
- 06The merchandiser builds the quotation in the Excel costing template once every input is in.
In the sample sets we have been shown, a department's "template" is a Word file holding a screenshot of its Excel block, and the wash rate is a photo of a hand-filled form. The inputs arrive as pictures, by email or WhatsApp, when the department gets to them. The merchandiser's forty-five minutes cannot start until the last picture lands.
Two clocks
It helps to keep two clocks. The hands-on clock is the merchandiser's own time: reading, extracting, asking, building the sheet. The waiting clock is everything in between: the request sitting in a department's inbox, the reply sitting in the merchandiser's. For one RFQ the hands-on clock reads about an hour and a quarter. The waiting clock reads days. A tool that only speeds up the hands-on clock leaves the quote where it was.
What changes the waiting clock
Three things, none of them a new system for the departments to learn.
- The AI drafts each department's part first: a first SMV from the operation list, consumption from the marker at the factory's own size ratio, a BOM priced from the supplier quotes the factory already holds, the wash at the plant's last quoted level. The department head opens a task with the draft and the buyer's files side by side, and approves or corrects. Checking a number takes minutes; producing one took the afternoon.
- Every line carries its basis. Established means a past order, a rate card, a supplier quote or a signed price, cited. Derived means arithmetic on established figures, shown. Assumed means a stated norm, flagged with what would settle it. A line with no basis is a question to a person, never a guess that slips into the FOB.
- The sheet builds itself from what the departments return, in the factory's own template if it has one. The merchandiser's job becomes the part that needs her judgement: is this the price we send, and at what margin.
What "the same day" honestly means
The machine part is minutes. The people part is however long the department heads take to check their draft, which in a factory that runs this way is the same day, because the request is a task with the answer attached, not an email asking for an afternoon's work. If an input is missing, the clock stops and the merchandiser is told exactly which input, so the chase is one message rather than a round of calls.
The sheet goes to the merchandiser as a draft to check against her own numbers, and any line more than 10% from the factory's last similar sheet is flagged. What it saves is the department wait. The judgement stays where it was.
Try it on one RFQ
The buyer's RFQ email or tech pack; your fabric quality and price if known; your labour cost per minute, or your last cost sheet for a similar style; and your own cost-sheet template if you want the result in that layout. Missing inputs are asked for within four hours.
Only the two founders. Your files stay in a private folder and workspace, are never shared with another client and never used for another client's sheet. The AI models process them through zero-data-retention routing, so the model companies do not keep or train on them. Ask, and we delete our copies.
Every sheet is a draft for your merchandiser to check, with the basis of every line shown and any line far from your last similar sheet flagged. We test our sheets against prices factories later agreed, and we will walk you through the current results on a call.
No. It drafts their parts and puts the buyer's files next to the draft. Each department head approves or corrects their own part, and the merchandiser approves the FOB. What goes away is the waiting and the retyping.
